❄️ HVAC & Cleanroom EPC ⚡ Electrical & HT/LT Substations 🔥 Fire-Fighting & Plumbing (PHE) ☀️ Solar & Industrial Turnkey

From Tender Costing & BOQ Amendments to PO, Batch PDI, MDCC, Tally & Site GRN

Engineered by Webdoid Technologies (Bhopal) for MEP & EPC Contractors—Multi-Sheet Costing, R0→R1 BOQ Amendments, Non-BOQ Purchase Requisitions (PR), MDL CAT-1 Gates, L1 Vendor Freeze, 18-Clause PO Studio, Batch Manufacturing Clearance, Tally Connector, SMTP Email Gateway, and 9:00 AM Overdue Escalation Scheduler.

Every Module Screen — Explained in Complete Detail

Designed with our proprietary Webdoid ERP Dark-Glass Top-Dock Architecture. Explore every screen from Enquiry to Tally Billing below.

MODULE 01 · SINGLE-SCREEN EXECUTION HUB

Live Batch-Wise Project Material Tracker

Track every BOQ item from Purchase Order to Manufacturing Clearance, Factory PDI, MDCC, Invoice Request, and 4-Step Site Receiving on a single screen.

  • ◆
    Expandable Batch Splitting: One PO line (e.g. 12 Chillers) splits into Batch 1, Batch 1.1 (Balance after partial PDI), and Batch 2.
  • ◆
    Live Stage Filter Chips: Filter lines by Cleared for Mfg, Readiness Due, ITP/QAP Status, PDI Inspection, MDCC Issued, Invoice Requested, Gate Entry, Store Entry, IMIR, Ready to Pay.
  • ◆
    Direct Action Triggers: Issue Clearance, Schedule PDI, Upload MDCC, or Request Invoice directly from the row.
W Webdoid ERP · Execution Command Center
Schedule Purchase Studio Mfg Clearance Live Material Tracker
PRJ-2026-104 · Metro Underground Station HVAC & Tunnel Ventilation
Client: Metro Rail Infra Corp · Package Scope: Turnkey HVAC
● Live Execution
28
BOQ Lines
19
Mfg Cleared
14
PDI Passed
11
MDCC Issued
9
Site GRN Done
BOQ Item / BatchPO & VendorOrdered / ClearedITP & QAP GatePDI & TCMDCC / Site Step
Centrifugal Water Chiller 450 TR PO-26/088 · Climaveneta 4 Nos / 4 Cleared Cat A · QAP Approved 2 Split Batches In Progress
↳ Batch 1 (3 Nos Released) MCN-041 (10-Oct) Passed: 2 Nos PDI Pass · TC Filed MDCC-019 ✔ Gate → Store → IMIR → GRN
↳ Batch 1.1 (Balance) (1 No) Auto-Split Balance Ready: 22-Oct Re-Offer PDI Pending
Smoke Extraction Axial Fan 80,000 CFM PO-26/092 · Systemair 16 Nos / 8 Cleared Cat C · Direct on TC MTC Uploaded
MODULE 02 · ESTIMATION, COSTING & SALES ORDER

Multi-Sheet Excel Costing, Interactive Margin Simulator & SOPF Flow

Upload your multi-tab Estimation Excel on the Tender Enquiry. Parse main equipment, child accessories, labour rates, and lumpsum works automatically.

  • ◆
    Interactive Margin Simulator: Slide or type your target margin % below to see live recalculated Supply & Quote multipliers.
  • ◆
    3-Step Won Sales Order Flow: Sales uploads Client PO + SOPF (Sales Order Processing Form) → Director Approves (auto-opens Project) → Accounts Reviews SOPF.
  • ◆
    Accessory & Lumpsum Tracking: Accessories with material + labour splits travel to the Project PO Desk so nothing is missed.
W Webdoid ERP · Estimation & SOPF Studio
1. Enquiry Info 2. Costing Simulator 3. Vendor Quotes 4. SOPF & Client PO
ENQ-2026-312 · Data Center Phase-2 Electrical & HVAC
Base Material + Labour Index: 100.0 Units · Client PO: #DC-PO-9981
18% Margin
1.00x
Base Cost Index
1.22x
Simulated Bid Multiplier
+22.0%
Markup on Cost
SOPF Approved
Sales Order Status
Row KindBOQ / Accessory ItemQtyMaterial SplitLabour SplitStatus
Main BOQ33kV HT Vacuum Circuit Breaker Panel6 NosSupply BOQErection BOQMapped
Accessory↳ Numeric Protection Relay & CT/PT Set6 SetsChild MaterialPanel TerminationsLinked to PO
LumpsumCrane Rigging, Testing & Commissioning1 LotSite ServicesTesting CrewLocked
MODULE 03 · L1 FREEZE, SAVING & 18-CLAUSE PO

Smart Purchase Order Studio — Saving vs. Estimate & 5-Stage Payment Builder

Compare multi-vendor RFQ quotes, freeze L1 rates item-wise, verify statutory KYC via Accounts, and generate 2-page corporate PO PDFs with 18 standing legal clauses.

  • ◆
    Live Saving vs. Estimate Box: Shows Management the exact % saved against the Costing Sheet before approving the PO.
  • ◆
    5-Stage Payment Terms Builder: Enter % for Advance against PI, Mfg Clearance, Readiness, Dispatch, I&C — auto-computes Balance % and validates Total ≤ 100% + PDC Days.
  • ◆
    Dynamic Clause Toggles: Toggle Clause 3 (FOR Destination) and Clause 13 (LD 2%/week max 10%); unticking LD automatically renumbers clauses 1–17 on the PDF!
W Webdoid ERP · Smart PO & Clause Builder
L1 Quote Freeze Raise PO & 18 Clauses Accounts KYC Check
PO-26/114 · ABB Power Products Ltd (GST & PAN Verified ✔)
L1 Frozen vs Tender Estimate Baseline · Approved by Director
Net Saving: +6.2% Below Estimate
10%
1. Advance on PI
15%
2. Mfg Clearance
25%
3. Readiness
40%
4. Dispatch
10% (Auto)
5. Balance I&C (45d PDC)
Required Clause ControlConfiguration on POPDF Output Behavior
Clause 3 · FOR Destination☑ Enabled (Default ON)Prints freight & packing included up to site
Clause 13 · Liquidated Damages (LD)☑ 2% per week · Max 10%Editable text; unticking renumbers 18 → 17 clauses
Compliance Attachments✔ Signed QAP.pdf ✔ Signed TDS.pdfLinked to PO for QC & Management review
MODULE 04 · ENGINEERING MDL, QAP & DUAL SCHEDULES

Master Drawing List (MDL), R0/R1/R2 Dual Archive & Schedule Dependencies

Control every Drawing, TDS, and ITP/QAP submission with baseline dates, predecessor dependencies, and client approval categories.

  • ◆
    2 PDFs Stored Per Revision: Every revision (R0, R1, R2) stores both Our Submitted PDF and the Client Commented/Stamped Copy.
  • ◆
    CAT-1 to CAT-4 Gatekeeper: Only CAT-1, CAT-2, and CAT-4 allow Manufacturing Clearance. CAT-3 (Rejected) automatically blocks production and sets a "Resubmit By" deadline.
  • ◆
    Dual Schedules: Separate Engineering Drawing Schedule and Purchase Line Schedule (with assigned Purchaser per project).
W Webdoid ERP · Engineering MDL & Schedule Matrix
MDL & Revision Register Drawing Schedule Purchase Schedule ITP / QAP Matrix
MDL Doc No.Document TitleRevTwo-Copy ArchiveClient CategoryMfg Clearance Gate
MDL-EL-001 GA & Schematics for 33kV HT VCB Panel R1 Sub.pdf Stamped.pdf CAT-1 (Approved) ✅ Cleared for Mfg
MDL-EL-002 2500 kVA Dry Type Transformer TDS R2 Sub.pdf Commented.pdf CAT-2 (With Comments) ✅ Prints Remarks on MCN
MDL-EL-003 Busduct Routing Layout — Basement 2 R0 Sub.pdf Markup.pdf CAT-3 (Resubmit by 18-Oct) ⛔ Hard Blocked

BOQ Amendments (R0 → R1), Extra PRs & PO Amendments

Full visibility and strict approval gates whenever project quantities, non-BOQ site requirements, or PO terms change.

MODULE 05 · BOQ, PR & PO AMENDMENT ENGINE

How Every Change is Controlled Without Losing Margin

  • 1.
    BOQ Amendment (Tender R0 vs. Design R1 Ceiling): When Shop Drawings change the required quantity from Tender BOQ (R0) to Execution Design (R1), the system locks Manufacturing Clearance to min(PO Qty, R1 Design Qty)—stopping excess production immediately.
  • 2.
    Purchase Requisition (PR) for Non-BOQ Items: If the site team needs extra items outside the BOQ, the Project Manager raises a PR → Management approves → Purchase orders against that PR (pr_ref), updating Ordered vs Balance live.
  • 3.
    PO Amendment & Version History (v1 → v2 → v3): When Accounts or Management sends back a PO or an approved PO is revised, every field change (Old Value vs. New Value, User, Timestamp) is recorded in the Version Audit Trail.
W Webdoid ERP · Amendment & Revision Control Center
R0 vs R1 BOQ Ceiling Approved PRs (Outside BOQ) PO Version Diff (v3)
Amendment TypeItem / ReferenceBaseline (R0 / Est)Amended (R1 / PR)System Control Rule
BOQ R0 → R1 GI Cable Tray 600mm Perforated R0 BOQ: 1,200 Mtr R1 Design: 1,050 Mtr Mfg Clearance Capped at 1,050m
Extra PR Line PR-26/034 · Fire Stop Sealant Bags Not in Tender BOQ Approved PR: 80 Bags Ordered: 50 · Left to Order: 30
PO Revision v2 PO-26/088 · Spec & Delivery Amended v1 Baseline Spec v2 Revised Spec (-3.3%) Full Diff Logged · Re-Approved

Complete Accounts Invoicing, 3-Papers Match & Tally Integration

Separates Accounts Payable (Vendor Bill Check) from Accounts Receivable (Client Tax Invoice) while hiding vendor rates from Site Engineers.

MODULE 06 · 3-WAY MATCH, TALLY & SITE PRIVACY

Every Account Invoice & Tally Voucher in One Flow

  • 1.
    Pre-PO Vendor Statutory KYC: Accounts verifies Vendor GST Certificate, PAN & Cancelled Cheque before activating any vendor or approving any PO.
  • 2.
    Accounts Payable (AP) — Vendor Bill vs. PO Check: Purchase uploads the Vendor's Purchase Bill & E-Way Bill against the MDCC. System calculates PO Value vs. Vendor Bill Difference; AP marks it verified and enters the Tally Purchase Voucher Ref (tally_ref).
  • 3.
    Billing Team (AR) — Client Tally Tax Invoice: AR verifies all 3 papers (MDCC + Vendor Bill + E-Way Bill), enters Client Tally Invoice No. (invoice_no_tally), HSN, CGST/SGST/IGST, and dispatches to Site.
  • 4.
    Strict Site Privacy & Payment Ledger: Site only sees your Client Tax Invoice (never the vendor's bill!), logs Gate → Store → IMIR → Client GRN, and Accounts tracks multi-tranche bank receipts (Part Paid → Paid).
W Webdoid ERP · Accounts 3-Way Match & Tally Bridge
Vendor KYC 3-Papers Bill Check & Tally Payment Receipts Ledger
Shipment INV-26/109 · Clubbed MDCC-019 & MDCC-022 (Vehicle MP-04-GA-4421)
🔒 Site Privacy Active: Vendor Purchase Bill Hidden from Site Engineer Login
3-Way Matched ✔
Verification LayerDocument & Tally RefPO Match StatusTax & E-Way VerificationStatus / Action
1. Vendor Purchase Bill (AP) Bill #V-8821 · Tally AP: PUR/26/409 100% Matched to PO Zero Variance (18% GST) ✔ Checked vs PO by AP
2. Client Tax Invoice (AR) Tally Sales: GST/26-27/118 · E-Way #99120 Client BOQ Rate Applied HSN & GST Validated ✔ Sent to Site Desk
3. Site 4-Step & GRN Gate ✔ → Store ✔ → IMIR ✔ → GRN #CL-771 Tranche 1 Received (RTGS) Retention Tracked Part Paid · Due 28-Oct

Incoming/Outgoing Emails, 9:00 AM Scheduler & Escalation Matrix

Never chase teams manually on WhatsApp—automated cron jobs and aging alerts escalate delays to Management every morning.

MODULE 07 · SMTP GATEWAY, CRON SCHEDULER & ESCALATIONS

Real-Time Bell Alerts, Automated Emails & 3-Day Late Escalation

  • 📧
    SMTP Email Engine (Incoming & Outgoing): Sends automated emails with PDF links on PO Approval, Mfg Clearance, PDI Schedule, MDCC & Invoice steps—plus vendor pre-dispatch document submission to Purchase email.
  • ⏰
    Daily 09:00 AM Cron Scheduler (APScheduler): Automatically scans all projects every morning and triggers alerts for:
    • Overdue MDL Drawings & CAT-3 Resubmissions
    • Overdue Purchase Schedule (Planned PO Date crossed)
    • Approaching Material Readiness & PDI Dates
    • Client Invoice Payment Due (7d, 3d, 1d & Overdue)
  • 🚨
    Director's Department Escalation Matrix: Tasks pending for more than 3 days (late_after_days) turn red with exact aging days (Oldest: 8d) and 🔥 Urgent priority flags.
W Webdoid ERP · 09:00 AM Scheduler & Escalation Radar
🚨 Escalation Matrix (>3d Late) 🔔 Live Bell Alerts (14) 📧 SMTP Email Log
DepartmentPending Bottleneck TaskProjectAging / EscalationAutomated Trigger
Design / MDL CAT-3 Drawing Resubmission Overdue PRJ-2026-104 🚨 6 Days Late Bell + Email to Design Head & Director
Purchase 3 BOQ Lines Crossed Planned PO Date PRJ-2026-109 🚨 4 Days Late Alert to Assigned Purchaser + Management
QC / Projects Vendor Readiness Reached — Schedule PDI PRJ-2026-104 ⏰ Due Today 9:00 AM Cron Alert to QC Inspector
Accounts Client Invoice #GST-118 Payment Follow-up PRJ-2026-101 🔥 Urgent Flag Payment Reminder + Director Dashboard

6 Personalized Department Desks

Click any role below to preview what that department sees the moment they log in.

W Director & Management Command Desk
Sorted by Highest Priority & Waiting Count
ProjectSales Order ApprovalExecutive PO ApprovalsMCN ApprovalLate Escalations (>3d)Receivables Track
PRJ-2026-104 · Metro HVACConfirmed2 POs (Saving +6.2%)1 Pending2 Late TasksActive Follow-up
PRJ-2026-109 · Data Center1 SOPF Waiting0 Waiting0 PendingOn TrackMilestone Verified
ProjectBOQ Lines Without POApproved PRs to OrderPOs Returned / DraftVendor Bills to UploadSchedule Overdue
PRJ-2026-104 · Metro HVAC5 Lines Left2 PR Items1 Draft PO2 Dispatches Need Bill1 Overdue
ProjectMDL Drawings to SubmitCAT-3 To ResubmitQAP Under ApprovalMfg Clearances to Raise
PRJ-2026-104 · Metro HVAC4 Due This Week1 CAT-3 Rejected2 Pending Client3 Ready for MCN
ProjectReadiness Follow-UpPDI Inspection to ScheduleMDCC PendingReady for Invoice Request
PRJ-2026-104 · Metro HVAC3 Batches Ready2 PDI Scheduled1 Awaiting Client MDCC2 Batches Ready to Bill
ProjectSOPF ReviewsPO GST/PAN CheckVendor Bill 3-Way Match (AP)Client Tax Invoice (AR)Payment Collection
PRJ-2026-104 · Metro HVAC01 PO Waiting2 Bills to Verify for Tally1 Ready for E-Way BillTranche Pending
Shipment / InvoiceVehicle No.Step 1: Gate EntryStep 2: Store EntryStep 3: IMIR InspectionStep 4: Client Stamped GRN
GST/26-27/118 (Vendor Bill Hidden)MP-04-GA-4421✔ Done (Photo)✔ Done✔ IMIR Signed

Flexible Cloud SaaS or Dedicated Server Licensing

Configure your Company Logo, 18 PO Clauses, Executive Approval Thresholds, Custom Fields, and Department Roles from the Admin Panel.

OPTION 1 · MULTI-TENANT CLOUD SAAS

Monthly / Annual Cloud Subscription

Go live in 24 hours with zero server management.

  • ✅ Isolated Company Database Workspace (company_id separation)
  • ✅ All 6 Department Desks, Costing, MDL, PO, PDI, MDCC & Tally Bridge
  • ✅ Custom Logo, GST & 18-Clause PO PDF Generator
  • ✅ Automated SMTP Emails & 09:00 AM Escalation Scheduler
  • ✅ Full Team Onboarding & Role Training by Webdoid Technologies

📅 Schedule Your Live ERP Demo

Enter your details below to book a 1-on-1 live walkthrough with Webdoid Technologies (Bhopal HQ) and receive a tailored quotation.